preloader

Operation and Maintenance

TWIC has a team of multidisciplinary experts which includes Managers, Process Engineers, Laboratory Chemists, Maintenance Engineers, Engineering staff (Electrical/Mechanical/Instrumentation/Civil), and Operators. 

TWIC has wide experience in providing services as an O & M Operator on turnkey basis and provides O & M services for 

  1. Water Treatment plant
  2. Industrial effluent treatment and recycling plant
  3. Sewage treatment plant
  4. Industrial & Municipal water supply and distribution system
  5. Sea Water Desalination Plants
  6. Waste management system.
Sectors
Industrial Water

Client: Tiruppur Textile Dyeing Industries

O&M services for Zero Liquid Discharge (ZLD) based on nine Common Effluent Treatment Plants with capacities ranging from 3 MLD to 11 MLD (combined capacities of 53 MLD) in Tiruppur textile cluster. The effluent from various industries collected, metered, and conveyed to the Common Effluent Treatment Plant (CETP) for treatment and recovered water distributed back to the industries for processing. These CETPs are equipped with Pre-treatment system (Biological Oxidation system based on Activated Sludge Process), Reverse Osmosis system and Mechanical Evaporator for RO reject handling.

TWIC has well qualified and experienced team of Managers, Engineers, Chemists, Operators and Technicians for monitoring the operation of the CETPs round the clock.

Sea Water Desalination
SL. No. Description Details
1. Nature of Work Operation & Maintenance of 11 MLD Desalination Plant
2. Location Cuddalore, Tamilnadu
3. Beneficiary ILFS Tamilnadu Power Company Limited (2×600 MW Power Plant)
4. Services Operation & Maintenance
5. Period 2015 to 2018
6. Description of Work

a· SWRO Desalination plant at Cuddalore for the capacity of 11 MLD with Energy Recovering equipment (PX300 @ 284 m3/hr) includes all pre-treatment plants such as Flocculation, Sedimentation system (4×330 m3/hr), Gravity Sand Filter (3×440 m3/hr) and Pressure sand filter (16 x 94 m3/hr).

b· Two stage BWRO Desalination Plant: Stage -I (2 x 110 m3/hr) + Stage -II (2 x 80 m3/hr)

Urban Water

Page Under Construction

Lake & River Restoration

Page Under Construction